The kitchen remodeling trade spans kitchen flooring, backsplash install and cabinet refacing, and each of those jobs has a different bar for what a qualified company looks like. Good providers write clear scopes for jobs like backsplash install, so the price you compare is the price you pay.
No single company is right for every job on this page, so put two or three providers head to head before deciding. The table and state directory below are built for exactly that comparison - ratings first, quotes second, contract last.
Compare qualified professionals
Review available providers, verify licensing and insurance, and compare written scopes before hiring.
| Company | Headquarters | Phone |
|---|---|---|
| United States | (201) 409-7055 | |
FreshKitchen Remodeling Verified | Raleigh, NC | (703) 972-6734 |
| Sacramento, CA | (617) 271-8430 | |
| Portland, OR | (425) 272-9060 | |
Modern Hearth Kitchen Remodeling Verified | Salt Lake City, UT | (213) 898-6108 |
| Richmond, VA | (480) 210-4023 |
What the work usually covers
The work homeowners book in this category is narrower than its name suggests. In practice it concentrates on countertop replacement, cabinet refacing, sink & faucet install and backsplash install — jobs that differ enough in scope that a single quoted figure rarely transfers between them.
Contractors scope these differently. One may quote a repair where another quotes a replacement, so two numbers that look far apart often describe two different jobs. Ask each to write down what is included, what is excluded, and what would change the price once work starts.
- Kitchen Remodeling
- Countertop Replacement
- Cabinet Refacing
- Sink & Faucet Install
- Backsplash Install
- Wet Area Remodeling
- Kitchen Flooring
- Full Kitchen Remodel
What moves the price
There is no single national figure for this work. Published averages blend regions, property ages and scopes that have little to do with each other, which is why a national number rarely survives contact with a real quote.
- whether the job needs a permit or an inspection
- local labour rates, which vary widely by metro
- how quickly you need the work completed
- warranty length and what it actually covers
- whether the visit is diagnostic or a committed repair
Doing it yourself, and when not to
Maintenance you can reasonably handle yourself sits alongside work that should not be attempted without training. Consequence, not difficulty, is the right test for which side a job falls on.
Jobs such as sink & faucet install, backsplash install, wet area remodeling are the ones homeowners most often ask about in this category. Where the work touches structure, gas, water under pressure, or anything load-bearing or electrical, the cost of getting it wrong is high enough that a professional visit is usually the cheaper path.
Choosing the right contractor
Verification matters more here than price. Ask each contractor for licence details, proof of insurance and a written scope before work begins — and check the licence number against your state board rather than taking a copy at face value.
- References from work completed in the last year, ideally on comparable properties.
- A payment schedule tied to milestones rather than a large deposit up front.
- A clear warranty on both labour and materials, with the duration of each stated separately.
- A written scope listing what is included, what is excluded, and how change orders are priced.
Comparing quotes on equal scope
Line up three proposals, put them on identical scope, and the spread usually narrows sharply. Whatever gap remains after that is the genuine difference in what each contractor is offering.
How long the work really takes
Ask for the timeline in stages, not totals: when materials arrive, when the crew starts, what can stall countertop replacement mid-stream, and what happens to the schedule when it rains.
Living through the work matters too. What hours will the crew keep, what stays powered or usable during cabinet refacing, and what does the site look like each night? Good shops answer without hesitation.
The money conversation
Separate the two decisions: who should do cabinet refacing, and how you should pay for it. Bundling them is how a mediocre bid wins on monthly-payment framing.
Deposits have norms: modest up front, staged against progress, meaningful balance at completion. A sink & faucet install contract that wants most of the money before work starts inverts your leverage.
Where quality actually differs
Every product line here comes in tiers, and the labels are marketing. The real questions for sink & faucet install are lifespan, failure mode, and what the warranty excludes at each price point.
Availability is part of quality: a material for backsplash install that takes six weeks to source will take six weeks again when a repair is needed. Common beats exotic for most homes.
The urgency premium
Triage beats panic: some failures need someone now, most need someone this week. Knowing which category backsplash install falls into is worth real money.
Keep a shortlist before you need it. Choosing a provider for wet area remodeling during an emergency means choosing from whoever answers - the worst possible selection process.
The five-minute phone screen
A good screen is specific. Describe your wet area remodeling situation and listen for questions back - real pros interrogate the problem before they estimate it.
End with logistics: how far out is the schedule, is the estimate written and itemized, and is there a fee for the visit? Three answers, and you know how this company treats kitchen flooring customers.
Why your market changes the math
The market you are in is a bigger price factor than the brand you choose. kitchen flooring in a high-wage coastal metro and the same scope in a rural county are different products with the same name.
Regulation is regional too: the license class required for full kitchen remodel in one state may not exist in the next. Verify against your own state's rules, not a national generalization.
Claims, coverage and contractors
Insurers and contractors read the same damage differently. On claim-driven full kitchen remodel, an itemized scope from your own chosen provider is your leverage in the adjustment conversation.
Deductible "discounts" are a known scheme, not a favor: a provider offering to absorb your deductible on countertop replacement is usually planning to recover it from scope. Insurers treat it as fraud, and so should you.
Right-sizing the hire
Minimum charges tell you who a shop is for. Where the trip fee rivals the cost of the fix, countertop replacement is being quoted by a company tuned for bigger work.
For small work, responsiveness beats brand: the shop that can slot cabinet refacing in this week at a fair minimum is worth more than a famous name with a three-week backlog.
What you are really paying for
Every bid in this category is three numbers wearing one price tag: labor, materials, and overhead. On cabinet refacing, labor usually dominates; on sink & faucet install, materials can flip that ratio entirely.
That is why two competent companies can be hundreds of dollars apart on sink & faucet install while both quoting fairly: one assumes complications the other prices only when found. Ask each bidder what their number assumes, and the spread usually explains itself.
Seasonality and scheduling
Crews are not equally busy all year. The weeks when sink & faucet install requests spike are the weeks when scheduling slips and premiums appear on the invoice.
Ask each provider when they would ideally do the job, not just when they can fit you in. The answer separates a calendar-driven shop from a quality-driven one on backsplash install.
The paperwork side of the job
Municipal rules reach further into this category than most homeowners expect. backsplash install can trigger inspection requirements that vary not just by state but by county and city.
Inspections protect you, not the city. A failed inspection on wet area remodeling caught mid-project costs far less than the same defect discovered after everything is closed up.
Before you choose
- Ask for proof of workers' compensation coverage if the company has employees - without it, an injury can become your liability.
- Ask about warranties on both labor and materials before work begins.
- Ask how the company handles permits and inspections - established pros manage the paperwork themselves.
- Compare multiple written quotes so you understand the true market price for your project.
- Confirm who actually performs the work - the company's own crew or subcontractors - and who supervises it.
- Never pay a large deposit up front; reputable companies tie payments to completed milestones.
Browse by state
Local providers, state licensing requirements, and regional cost context in every market we cover.
- Alabama
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- Florida
- Georgia
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming